Four duplexes, 2 bedroom/2 bath in each of the eight units, in central Panama City close to everything. These units were taken down to the concrete block walls and studs after Hurricane Michael and completely rebuilt with new roof, new PVC plumbing from all fixtures in slab to outside, all plumbing lines with PEX, spray foam on roof deck, new HVAC units and ductwork, new appliances, completely new sheetrock, new plumbing fixtures, new lighting fixtures, new electric service and wiring, new flooring, indoor laundry room and much more. Layout and spec sheet in photos and in documents